Skip to main content
app.groundand.com · Boreholes · BH-101
G&Coastal development · Demo project Rocco

BH-101 · Log entry

Depth (m)DescriptionUSCSSPT incrementsN30Sample
0.00–1.20Silty fine SAND, brown, looseSM——D1
1.50–1.95Silty fine SAND, brown, medium denseSM4 · 6 · 713S1
3.00–3.45Sandy lean CLAY, grey, stiffCL6 · 9 · 1120S2
4.50–4.95Sandy lean CLAY, grey, very stiffCL8 · 12 · 1426S3
6.00–6.45Calcareous SANDSTONE, weak—10 · 14 · 50/75mmRefusalC1

Live log preview

1.2m
3.0m
4.5m
6.0m
7.5m

Preliminary · Checked · not approved

Boreholes · BH-101

Product interface shown with demo project data.

What makes it different

Log entry against location and depth

Drilling records, strata descriptions, sampling and groundwater readings entered once, bound to the borehole and depth interval.

Live log preview

The borehole log draws itself as you enter, so the logger sees the deliverable while the rig is still on site.

Checks on entry

Integrity, engineering logic, AGS 4.1 reference and plausibility checks run on every record, not at export.

Field-realistic conventions

SPT N from the full drive; refusal preserved verbatim, never summed; USCS to ASTM D2487 / D2488; descriptions to BS 5930 and ISO 14688 / 14689.

Approval before issue

Every result is approved by the responsible engineer before it reaches a log, report or AGS file.

One record, many outputs

The same approved record produces logs, factual report tables, Excel and AGS 4.1 packages — no re-entry.

Questions

+Is G& a borehole log drafting tool?

No. G& is a geotechnical data platform: the log is one output of a governed record that also feeds reports, quantities and AGS 4.1 files.

+Can G& read my existing logs?

Yes. AGS and Excel files import through the same checks as live entry, and scanned handwritten logs are transcribed with engineer review.

+Which standards do the logs follow?

Descriptions to BS 5930 and ISO 14688 / 14689, classification to ASTM D2487 / D2488, in-situ testing to ASTM D1586 and BS EN ISO 22476-3, and AGS 4.1 for data exchange.

+Who approves a log before it is issued?

The responsible engineer. Every result is approved before it reaches a deliverable, and independent four-eyes review can be enabled per project.